Phased Renovation

Whole House Remodeling in El Paso, One Phase at a Time

Complimentary consultation · Sage calls within one business day
Read Sage's reviews on Google
El Paso Registered GCLCCR26-00183Fully InsuredBondedOSHA 30 TrainedSe Habla Español
Updated
En español

A whole house remodel in El Paso, Texas is planned as one scope and built in phases: approvals first, including historic review where the lot carries the H overlay, then structure and the trade rough-ins, City inspections before anything is covered, and finishes last.

A whole house remodel puts the kitchen, the baths, the floors, the walls and sometimes the roof into one plan, often in a house someone is still living in. Sage writes the whole scope before the first phase starts, so each phase is built to fit the ones after it. Electrical, plumbing and mechanical work runs under its own permits, on a schedule Sage coordinates, and you keep one point of contact from the first phase to the last.

Investment · Confirmed at Feasibility AuditPhased and scope-dependent, set at Scope Lock after the Feasibility Audit
What's Included

Scope, documented.

Everything below is defined and locked in writing at Scope Lock, before demo begins. Anything added later needs your written approval first.

  • One written scope for the whole house before the first phase starts
  • Phasing planned around the rooms you need to keep using
  • Demolition and rebuild sequenced so nothing is torn out twice
  • Permits for our scope, with City inspections sequenced phase by phase
  • Framing, drywall, tile, flooring, paint and finish carpentry
  • Historic-district submittal for our scope, prepared for the owner's signature, where the lot has the H overlay
  • Milestone-based schedule and payment plan
  • Photo updates at every phase

Where do I start with a whole house remodel in El Paso?

Start with two facts about the house, not the finishes: whether the lot carries the City's historic overlay, and what the roof, the structure and the systems need before anything new goes on top of them. Those two decide the order of everything else.

The overlay comes first. If the lot sits in one of the City's historic districts, the exterior plan goes through historic review before any building permit can issue, and that review changes the calendar more than any finish choice does. The historic district section below covers who reviews what.

Then the house itself. A roof near the end of its life, a floor plan that needs a wall moved, or an electrical service, plumbing or cooling system that has to be replaced decides which phase goes first. Where those systems are part of the question, each one is assessed before the phases are set, and what that shows can change the order.

The practical first step is the complimentary consultation: send photos through the consultation form, and the section after the frequently asked questions explains what comes back and what follows.

Why do approvals and inspections set the order of a whole house remodel in El Paso?

Because the City has to approve some of the work before it starts and see some of it before anything covers it, and every phase of a whole house remodel is scheduled around those two points.

Approvals come first. On a historic property, that means the approvals in the historic district section below. Inside the City of El Paso, Sage then pulls the permit for its own scope under its City registration, LCCR26-00183, and trade work carries its own permits, because the City requires separate permits for building, gas, plumbing, mechanical and electrical work (El Paso Municipal Code 18.02.105.4).

What is inside the walls goes before what is on them. Framing changes come first, then each trade rough-in, then the City's inspections. The City's code says structural framework may not be covered or concealed until the building official releases it (El Paso Municipal Code 18.02.107.8), so insulation and drywall are scheduled after each release, never ahead of it.

The rest of the order is the one any El Paso project follows: the roof and exterior openings are closed before drywall, tile and flooring go in, and the yard goes last, as the trades guide explains.

A phased plan also has to keep its permits alive. An El Paso building permit expires if work does not start within six months, stops for six months, or goes six months without an inspection, and residential roofing, window replacement, water heater and air conditioning conversion permits expire one month from issue, with no extension (El Paso Municipal Code 18.02.105.23). So a long remodel keeps inspections moving, and each phase is permitted when it is ready to build. The permits guide explains the rest.

Can I live in my house during a whole home renovation?

Often, yes, for most of it, when the phases are planned around the rooms you need most: a working bathroom, a place to cook and a bedroom with cooling. Some days are better spent somewhere else, and those days are named in the schedule ahead of time.

The usual approach is to keep one bathroom working while another is rebuilt, and to set up a temporary kitchen area before the kitchen comes out. A house with a single bathroom changes that plan, and it is one of the first things the Feasibility Audit looks at.

The days to plan around are demolition days, the days water or power is shut off for a tie-in, and floor finishing, when a room or a hallway cannot be walked on. In summer, the day the cooling is replaced or rerouted is scheduled as a short, announced window, placed outside the hottest weeks where the plan allows.

Dust is the everyday cost of living in a remodel. Work areas are closed off with dust barriers, and during El Paso's spring wind season any opening in an exterior wall is closed or covered before the end of the day.

Two City rules shape the day. Permitted work may run Monday through Saturday from 6:00 a.m. to 10:00 p.m., and work on Sundays or legal holidays needs an after-hours permit (El Paso Municipal Code 18.02.105.20.1). A dumpster or storage container kept on the property for more than seven days needs a City permit, and one on a City street always does (City of El Paso, When Do I Need a Permit).

Can a whole house remodel open up walls or move a bathroom?

Usually, yes, and in El Paso each of those moves changes the framing and the paperwork before it changes the floor plan.

Taking out a wall that carries load is demolition under the City's code, which defines demolition to include removing any load-supporting structural member. That makes it permitted work, and for interior demolition the City's application includes a hazardous material report (El Paso Municipal Code 18.02.108.1). The beam or header that replaces the wall is sized on paper first, with the design sealed by a Texas-licensed professional engineer where the scope requires one. The demolition page covers that permit in full.

Moving a bathroom, a laundry or a sink onto an outside wall has its own El Paso rule. The City's residential code prohibits plumbing inside exterior walls unless the wall is framed at least 2 by 6 and the pipes are protected from freezing, and water lines in a ceiling must sit on the warm side with at least 10 inches of insulation on the roof side (El Paso Municipal Code 18.10.240). A 2 by 4 exterior wall is reframed before pipe runs in it, or the line is routed through an interior wall instead, and that choice is written into the phase.

Every habitable room also needs real heating and cooling under an El Paso amendment (El Paso Municipal Code 18.10.060), so a den that becomes a bedroom is reached by a heating and cooling design under its own mechanical permit; the room additions page explains the rule.

Moving a kitchen sink to an island on a slab foundation is its own question, answered on the kitchen remodel page.

My house is in an El Paso historic district. What approvals do I need before remodeling?

You need the City's historic approval for the exterior work before any building permit can issue, and interior work is usually not reviewed. No building permit is issued for work on a landmark or a property with the historic overlay until the Historic Landmark Commission issues a certificate of appropriateness or the Historic Preservation Officer grants administrative approval, and that approval comes in addition to the permit, not instead of it (El Paso Municipal Code 20.20.080(B)). The permits guide covers the rule that historic review applies even when no building permit is needed.

The City's historic preservation FAQ lists nine locally designated historic districts: Austin Terrace, Chihuahuita, Downtown, Magoffin, Manhattan Heights, Mission Trail, Old San Francisco, Sunset Heights and Ysleta, and the City's open data map of historic districts maps all nine. The FAQ also names two districts on the National Register of Historic Places, Rio Grande and Montana Avenue. Local districts show as an H overlay on the City's official zoning map, and the Historic Preservation Office checks an address on request. The FAQ is undated, so confirm the district list and the steps below with that office for your address.

Review covers the exterior and the whole lot, not only the house: the FAQ names landscaping, driveways, windows, roofing, fencing and walkways. Interiors are not reviewed unless an interior has been designated, and interior work is acceptable as long as no structural members affecting the facades are modified. That condition is the one a whole house remodel meets most often, because moving a bearing wall, a window or a roofline can reach the facade.

Many minor exterior changes are approved administratively by the Historic Preservation Office. Additions, major exterior changes and work outside the adopted guidelines go to the Historic Landmark Commission for a certificate of appropriateness. The painting, roofing, windows and doors, stucco and demolition pages each explain how the City reviews that item.

The City's FAQ puts a certificate of appropriateness at approximately one month, pending any postponement by the Commission, with complete applications due two weeks before the Commission meeting. The code adds that the Commission hears an application on 10 days' written notice, and if it takes no action within 45 days of a complete application, the application is approved as submitted (El Paso Municipal Code 20.20.080(G)(1), (3)). The application asks for a scaled plot plan and drawings, the window and door types with a manufacturer sample of each, color and material samples, photographs of current conditions and proof of ownership (El Paso Municipal Code 20.20.080(D)), and every owner of record signs it.

Changes after approval involve the City too. Once a certificate is issued, a change to the permitted work needs a minor modification approved by the Historic Preservation Officer or a new hearing (El Paso Municipal Code 20.20.080(G)(4) and 20.20.090). The Officer inspects work done under a certificate, and work that departs from it is reported to the building official, who may issue a stop-work order (El Paso Municipal Code 20.20.110). A denied application generally cannot be resubmitted for twelve months unless conditions substantially change (El Paso Municipal Code 20.20.080(G)(5)). That is why the exterior plan for a historic house is settled on paper before it is submitted, and why every change is approved in writing before it is built.

The City also offers a historic tax exemption for the restoration or rehabilitation of qualifying historic sites, such as landmarks and contributing properties, and its application has to be filed before any restoration or rehabilitation work starts (El Paso Municipal Code 3.04.035). The Historic Preservation Office reviews most of these applications.

Inside a district, the City also reviews site work, such as new fences, walkways, driveways and landscaping. Where Sage's scope needs historic review, Sage prepares the historic-district submittal for its own scope, for the owner's signature.

What you planWho reviews it
Exterior changes to the lot: landscaping, driveways, windows, roofing, fencing, walkwaysThe Historic Preservation Office, with many minor changes approved administratively
Additions and major exterior changesThe Historic Landmark Commission, through a certificate of appropriateness
Interior work that leaves the facade structure aloneNot reviewed, unless the interior itself is designated
A change after the certificate is issuedThe Historic Preservation Officer for a minor modification, otherwise a new hearing
Demolition, whole or partialThe Historic Landmark Commission before any demolition permit (see the demolition page)
What Sage Documents First

How a dozen projects run as one plan.

01

Planned once, built in phases

The whole house is written as one scope and fixed at Scope Lock, then built in the order the house needs. A phase finished this spring is not torn out for next year's phase, because both were drawn before either began.

02

Photos before the walls close

Before insulation and drywall close a wall, the framing and each trade rough-in inside it are photographed, so you keep a record of what sits behind every finished wall, phase by phase.

03

One point of contact

Across every phase, you deal with Sage. Electrical, plumbing and mechanical work runs under its own permits, on a schedule Sage coordinates. Sage pulls the permit for its own scope under its City of El Paso registration, LCCR26-00183.

Financing Available

Finance this project through HFS.

See what you qualify for with a soft credit check that will not affect your credit score. No dealer fees and no home equity required.

Common Questions

Whole House Remodels in El Paso, answered.

What drives the cost of a whole house remodel in El Paso?

How much of the house changes, and in what order, more than any finish. The drivers are how many rooms are rebuilt, whether walls or the roofline move, whether the electrical service, plumbing or cooling has to be replaced, whether the lot is in a historic district, and how many phases it takes to keep the house livable. Pricing is a phone conversation with Sage. The complimentary consultation returns a preliminary assessment within 48 hours, not a price, and the investment is confirmed at the paid on-site Feasibility Audit and fixed in writing at Scope Lock. The remodel cost guide covers the drivers every El Paso remodel shares.

How long does a whole house renovation take in El Paso?

The schedule is set at Scope Lock, after the Feasibility Audit, because it depends on the scope, the number of phases and the approvals ahead of the work. On a historic property, the City's FAQ puts a certificate of appropriateness at approximately one month. Inside each phase, the City's inspections set the pace, and a family living in the house usually means more, shorter phases rather than one continuous push.

Do I need permits for a whole-home remodel in El Paso?

Almost always. Inside the City of El Paso, remodeling that involves a structural change, plumbing or electrical work, or permanently installed heating and cooling needs a permit, and a whole house scope nearly always includes at least one of them; painting, papering and similar finish work do not (City of El Paso, When Do I Need a Permit; El Paso Municipal Code 18.10.040). Sage pulls the permit for its own scope under LCCR26-00183, trade work carries its own permits, and on a historic property the historic approval comes first. The permits guide lists the City's rules project by project.

Can I do a whole house remodel in phases over a few years?

Yes, and it works best when the whole house is planned once and built in pieces. Designing every phase up front means the kitchen built this year already has the wall, the floor height and the pipe route set for the next phase, so nothing finished is torn out later. Each phase is usually permitted when it is ready to build, so no permit sits idle long enough to expire; the permits guide explains how long each El Paso permit lasts. Each phase starts from a written scope, as every Sage project does.

What is included in a Sage whole house renovation?

A written scope for the whole house, fixed at Scope Lock, and a phased schedule that places demolition, framing, inspections, drywall, tile, flooring, paint and finish carpentry in order, with milestone-based payments and photo updates at every phase. Sage pulls the permit for its own scope and, where the house has the overlay, prepares the historic-district submittal for its own scope, for the owner's signature. Electrical, plumbing and mechanical work carries its own City permits, on a schedule Sage coordinates, and you keep one point of contact from the first phase to the last.

Next Step

Start with photos of the house

Send photos through the consultation form and tell us whether the lot is in a historic district. Sage calls within one business day, and within 48 hours you get a preliminary project assessment, which is not a price and not a final answer, plus a render if the project is a fit. From there, the paid on-site Feasibility Audit (fee given by phone) produces the written findings and confirms the permit path for the address, Scope Lock fixes the scope, the phases and the investment in writing, and the phased build begins. Call 915-505-1323, in English or Spanish.

Sources

  1. City of El Paso, FAQs for Landmarked Properties and Properties in Historic Districts (undated City FAQ; confirm details with the Historic Preservation Office). Checked .
  2. City of El Paso Open Data, HistoricDistrict layer (modified 2023-06-22; maps all nine local district names in the FAQ, plus National Register listings). Checked .
  3. City of El Paso Historic Preservation Office, Certificate of Appropriateness Application (revised 9.26.2018). Checked .
  4. El Paso Municipal Code 20.20.080, Alterations and changes to landmarks and H-overlay properties ((B) no permit before approval, (D) application content, (G)(1), (3), (4), (5) Commission review). Checked .
  5. El Paso Municipal Code 20.20.090, Modification of certificate of appropriateness. Checked .
  6. El Paso Municipal Code 20.20.110, Enforcement (historic preservation). Checked .
  7. El Paso Municipal Code 3.04.035, Exemption for historically significant sites ((A)(5) qualifying sites, (A)(8) reviewing authority, (B)(1) apply before work starts). Checked .
  8. El Paso Municipal Code 18.02.105, Permits (105.4 separate trade permits, 105.20.1 construction work hours, 105.23 duration of permits, including one-month residential roofing, window, water heater and A/C conversion permits). Checked .
  9. El Paso Municipal Code 18.02.107, Inspections (107.8 structural framework not covered without release). Checked .
  10. El Paso Municipal Code 18.02.108.1, Demolition of building or structure. Checked .
  11. El Paso Municipal Code 18.10.040, Work exempt from permit (item 4, painting and finish work). Checked .
  12. El Paso Municipal Code 18.10.060, Required heating and cooling (IRC R303.10 as amended; explained on the room additions page). Checked .
  13. El Paso Municipal Code 18.10.240, Plumbing within exterior walls (IRC P2603.5.3 as added). Checked .
  14. City of El Paso Planning and Inspections, When Do I Need a Permit? (undated City sheet). Checked .